Introduction
The
reason for this lab is to understand and explain the development and reason for
the formation of the EPA. Other aspects include what the process of the EPA and
other organizations that work with the EPA do for the environment. Another aspect
is to look at the differences between superfund sites and how they are cleaned
up. We will also discus the Iron King Mine Humboldt Smelter Superfund Site
(IKMHSSS) is immediately adjacent to the town of Dewey-Humboldt, Arizona. I will
also look at the results for Phytostabilization from the Iron King Mine
Humboldt smelter Superfund and how it changes with no compost to percentages of
compost. In phytostabilization, plants are chosen which accumulate metals in
the root zone, rather than extract them into above-ground biomass, so as to
prevent metals from entering the food chain (Mendez and Maier, 2008).
| The four phases of EPA's planning, budget, and results cycle. |
What does the Environmental
Protection Agency (EPA) do?
To
accomplish this mission the EPA does a variety of things. Develop and Enforce of
Regulations, when Congress writes an environmental law, the EPA implements it
by writing regulations. Often, they set national standards that states and
tribes enforce through their own regulations. If they fail to meet the national
standards, they can help them. They also enforce their regulations, and help
companies understand the requirements. The EPA will also give grants; nearly
half of their budget goes into grants to state environmental programs,
non-profits, educational institutions, and others. These organizations use the
money for a wide variety of projects, from scientific studies that help us make
decisions to community cleanups. Overall, grants help them achieve their overall
mission: protect human health and the environment. The EPA will also study
environmental issues. At laboratories located throughout the nation, they
identify and try to solve environmental problems. To learn even more, they will
share information with other countries, private sector organizations, academic
institutions, and other agencies. The EPA will also sponsor partnerships, in a
statement made by the EPA “We don't protect the environment on our own, we work
with businesses, non-profit organizations, and state and local governments
through dozens of partnerships.” The EPA also works very hard to teach people
about the environment. They will teach the basics that include reducing how
much energy and materials you use, reusing what you can and recycling the rest.
Finally the EPA was and tries to publish information. Through written materials
and through their Web site, EPA informs the public about their activities.
| EPA headquarters building in Washington, D.C. |
1.
Why was the EPA established?
The
EPA was established because of concerns with pollution and the fact there was
no organization that could combat the pollutions that where effecting the environment
at the time. In a special Message from
President Nixon to the Congress, about Reorganization Plans to Establish the
Environmental Protection Agency.
To the Congress of the United States:
As
concern with the condition of our physical environment has intensified, it has
become increasingly clear that we need to know more about the total
environment--land, water, and air. It also has become increasingly clear that
only by reorganizing our Federal efforts can we develop that knowledge, and
effectively ensure the protection, development and enhancement of the total
environment itself.
The
Government's environmentally-related activities have grown up piecemeal over
the years. The time has come to organize them rationally and systematically. As
a major step in this direction, I am transmitting today two reorganization
plans: one to establish an Environmental Protection Agency, and one to
establish, with the Department of Commerce, a National Oceanic and Atmospheric
Administration.
Environmental Protection Agency (EPA)
Our
national government today is not structured to make a coordinated attack on the
pollutants which debase the air we breathe, the water we drink, and the land
that grows our food. Indeed, the present governmental structure for dealing
with environmental pollution often defies effective and concerted action. Despite
its complexity, for pollution control purposes the environment must be
perceived as a single, interrelated system. Present assignments of departmental
responsibilities do not reflect this interrelatedness. Many agency missions,
for example, are designed primarily along media lines--air, water, and land.
Yet the sources of air, water, and land pollution are interrelated and often
interchangeable. A single source may pollute the air with smoke and chemicals,
the land with solid wastes, and a river or lake with chemical and other wastes.
Control of the air pollution may produce more solid wastes, which then pollute
the land or water. Control of the water-polluting effluent may convert it into
solid wastes, which must be disposed of on land.
Similarly,
some pollutants--chemicals, radiation, pesticides--appear in all media.
Successful control of them at present requires the coordinated efforts of a
variety of separate agencies and departments. The results are not always
successful.
2.
What is a superfund site?
Superfund is the name given to the
environmental program established to address abandoned hazardous waste sites.
It is also the name of the fund established by the Comprehensive Environmental
Response, Compensation and Liability Act of 1980, as amended (CERCLA statute, CERCLA
overview). This law was enacted in the wake of the discovery of toxic waste
dumps such as Love Canal and Times Beach in the 1970s. It allows the EPA to
clean up such sites and to compel responsible parties to perform cleanups or
reimburse the government for EPA-lead cleanups.
4. Find three superfund sites
(besides IKMHSSS) and describe them:
1. Location, description
The South Cavalcade Superfund Site occupies
approximately 66 acres of land located approximately three miles north of
downtown Houston, Texas, and about one mile southwest of the intersection of
Interstate Loop 610 and U.S. Highway 59. The Site is rectangular in shape and
is approximately 3,400 feet long in the north-south direction by 900 feet long
in the east-west direction.
1.
When were they established?
A wood
treating plant operated at the Site from 1910 until 1962. The wood treating
process area was located in the southern portion of the Site along
Collingsworth Street. A coal tar distillation plant was also operated on the
southeastern portion of the Site from about 1944 until 1962. The Site is
currently occupied by three trucking firms, with much of the ground surface
(particularly in the southern half of the site) covered by pavement, buildings,
or storage areas. The NPL Inclusion Proposal Date: October 5, 1984. NPL
Inclusion Final Date: June 10, 1986.
| Waste water Treatment Plant |
1.
Contaminants?
Primary
risk from the site stems from the carcinogenic polynuclear aromatic
hydrocarbons (cPAHs), volatile organics, and metal salts associated with
creosote and the wood preservation process. These constituents are found both
in the contaminated soils and in ground water, as DNAPL and dissolved-phase
constituents. In 1983, the Houston Metropolitan Transit Authority investigated
the Site for potential use and found evidence of creosote in the subsurface.
1.
Who is responsible for the cleanup?
The
Site’s Responsible Party, Beazer East, Inc. (Beazer). This is the company that
ran the wood treatment plant along with the coal tar distillation plant. The Beazer
Company agreed to fund the cleanup and work alongside the EPA and the Department
of Environmental Quality.
1.
Cleanup results to date
Beazer
in 2005 have been discussing different ground water remedial options for the
Site, including a natural attenuation component. HCTRA met with EPA on January 26, 2010 and followed that
up with a letter seeking EPA’s concurrence on their approach to environmental
management practices during construction. EPA has concurred/responded to the
specific management practices listed in the letter on February 26, 2010. HCTRA
has received approval for the project and soil sampling of the Collingsworth
Road along the Site was completed in June. Along with this contaminated soil
have been contained and capped in two separate areas of the Site, eliminating
any potential for direct contact with impacted soils and ensuring current and
future protection of human health and the environment.
1.
Was phytostabilization used? If so, name two plants
species involved.
No,
there was no phytostabilizaton done as the ROD recommended soil flushing and
washing to reach a risk-based remedial goal.
2.
Location, description
The
213-acre Nineteenth Avenue Landfill is located in an industrial area of
Phoenix, Maricopa County, Arizona. It has been estimated that the landfill
contains approximately nine million cubic yards of refuse. An approximately 200
acre section of the site is located on the northern bank of the Salt River.
2.
When were they established?
In 1957, the City of Phoenix
extended an existing lease with the landowner to operate a municipal landfill.
The landowner brought in another party to start sand and gravel mining at the
site to create the space needed for the landfill. The mining and landfill
operations began shortly thereafter. The landfill was operated by the City of
Phoenix from 1964 until 1979, but was closed by a cease and desist order issued
by the Arizona Department of Health Services (ADHS), predecessor to the Arizona
Department of Environmental Quality (ADEQ), in February 1979. The NPL Inclusion
Proposal Date: 12/30/82. The NPL
Inclusion Final Date: 09/08/83.
2.
Contaminants?
Groundwater was found to contain very low levels of
volatile organic compounds (VOCs), heavy metals including arsenic, barium,
mercury, and nickel, and beta radiation. Sampling of soil and refuse in the
landfill during the RI had shown that the contents of the landfill are
generally similar to those expected in municipal landfills, although refuse in
the landfill also contains VOCs and pesticides. Soil contained VOCs,
polychlorinated biphenyls (PCBs), heavy metals and pesticides. During the RI,
the most frequently detected VOCs were ethyl benzene, 1,4-dichlorobenzene,
xylenes and toluene.
2.
Who is responsible for the cleanup?
The
City of Phoenix is the PRP for the 19th Avenue Landfill. The Arizona Department
of Environmental Quality was assigned the oversight lead at this site in 1988.
The City of Phoenix completed the Remedial Action Plan (RAP) in June 1989, and
it was approved by ADEQ in September 1989.
| The 19th Avenue Landfill site in Phoenix. |
2.
Cleanup results to date
Pre-final inspections were conducted to determine the
substantial completion of the project. A pre-final inspection of the gas
collection system and flare stations was performed on December 4 and 5, 1996.
Inspections for the other features of the project, including the completed levees
and channelization of the Salt River, were conducted on December 6 and 12,
1996. Based on the results of the inspections, the project was determined to be
substantially complete on December 6, 1996. Three Five Year Review Reports have
been completed. The first Review was conducted in September 2000, the second in
September 2005, and the third in September 2010. The 2010 Five Year Review
concluded that the site remedy is protective of human health and the
environment.
2.
Was phytostabilization used? If so, name two plants
species involved.
No, the
remedy uses permanent solutions and alternative treatment technologies to the
maximum extent practicable for this site.
3.
Location, description
The Carson River Mercury Site is a 50 mile length of
the Carson River, beginning near Carson City, Nevada and extending downstream
to the Lahontan Valley.
3.
When were they established?
Contamination at the site is a legacy of the Comstock
mining era of the late 1800s, when mercury was imported to the area for
processing of gold and silver ore. Ore mined from the Comstock Lode was
transported to mill sites, where it was crushed and mixed with mercury to
amalgamate the precious metals. During the mining era, an estimated 7,500 tons
of mercury were discharged into the Carson River drainage, primarily in the
form of mercury-contaminated tailings. The
NPL Inclusion Proposal Date: 10/26/89. The
NPL Inclusion Final Date: 08/30/90
3.
Contaminants?
Surface water, sediment, soil, fish and wildlife at
the site are contaminated with mercury. Mercury levels in game fish in Lahontan
Reservoir (e.g., walleye, white bass) routinely exceed the Food and Drug
Administration action level of 1 part per million (ppm). In 1998, a walleye had
record-high 16 ppm mercury present in its tissue.
3.
Who is responsible for the cleanup?
No PRPs
have been named for contamination at the site. Carson River Operable Unit 1
(OU1): After the site was listed on the Superfund National Priorities list, EPA
began the Remedial Investigation and Feasibility Study (RI/FS) at the site. The
initial phase of the investigation, which lasted from 1993 to 1995, involved
the collection and laboratory analysis of hundreds of samples including surface
and sub-surface soils, sediments, groundwater, vegetation, garden crops, and
indoor air. As part of the assessment, EPA established a site-specific cleanup
level of 80 ppm mercury for contaminated soils in residential areas. The 80 ppm
cleanup level is based on site-specific assumptions about the form of mercury
in the soil. From August 1998 through
December 1999, EPA’s contractors carried out cleanup work in Dayton and Silver
City.
3.
Cleanup
results to date
Excavation and removal of mercury-contaminated
tailings and soils from the Carson River Mercury Site have reduced the
potential for exposure to contaminated soil while further studies are taking
place.
3.
Was phytostabilization used? If so, name two plants
species involved.
No, as the process used consisted of clearing and
grubbing of brush, downed tree limbs, personal property, and debris.
Ultimately, approximately 9,000 cubic yards of contaminated soil were excavated
Most of the soils were disposed at a nearby landfill.
Specific IKMHSSS Questions (refer
to O’Sullivan Report and Iron King Field Study Slide Show)
5. How were the specific plant
species chosen for phytostabilization of IKMHSSS?
They
screened plants that were native to the Dewey-Humboldt area for
phytostabilization potential. These plants were chosen based on a visual examination
of the Dewey-Humboldt area and also on USDA guidelines for plant habitats in
the US. Plants were also chosen to represent trees, shrubs, and grasses to allow
for a variety of plant canopies and rooting depths. The rational for this
approach is that it will offer the best potential to achieve a stable
vegetative cap that functions to minimize erosion processes and that encourages
plant succession at the site in the decades following establishment of the
vegetative cap.
6. Why would composting increase the
pH of the soil?
The
pH levels of garbage, yard clippings, manure, and other compostable material is
often between 5.0 and 7.0 unless it contains ash or other highly alkaline
materials. All of these materials are found in compost. Compost will not
necessarily lower the pH of soil; however it does act as a buffer. Adding
compost to soil will give it a range of pH so to speak making it acceptable for
plants that prefer pH up to more than one point from the actual pH of the soil.
Another reason is “makes a nutrient-rich soil amendment that aids water
retention and slows soil erosion” (Cunningham
& Cunningham).
7. Interpret the tables in the O’Sullivan
Field Study Paper.
a. Refer to figure 1 and observe the
shaded bars. Give the grams dry weight for each species with
10% compost applied. Which species
grew more with less compost? Buffalo
grass was at 4grams. Mesquite was at 1.0 grams. Quailbush was at 1.5 grams. Catclaw
acacia was at .5 grams. Mountain mahogany was at .75 grams. Arizona fescue was
at .25 grams. With all of these numbers that I have given all are as precise as
I could get them when reading the chart.
b. Refer to figure 3. What was the
bacterial count for the planted control at time zero (at the
start)?
The
bacterial count planted plant at time zero for zero compost was about 103;
at 10% compost it was a little over 103; at 15% compost it was in-between
104 and 105; at 20% compost it was at 106.
c. Also figure 3. What was the
average bacterial count for the planted treatment area on Day 60
with
15% compost?
The average bacterial count for planted treatments at 15%
on day 60 was 108.
Conclusion
One of the main things I learned about was that the EPA is
an organization that has helped and contributed to the cleanup of thousands of
chemically toxic site. Another aspect about the EPA I learned was that it was
established to help combat the many human elements that have destroyed the environment.
The areas that the EPA has cleaned are known as superfunds as they don’t have a
person that is willing or nobody knows who is responsible for the
contaminations and is funded by the superfund.
While
many of the superfund sites that I discussed about had differences all of them
had problems with water especially the Carson River Mercury Site. What I felt
was interesting about this site was that the area was infected by mercury in
the late 1800s until around the 1900-1910 which was amazing when thing that
there was still high traces of it until the 1990s. When I found out though there
was an estimated 7,500 tons of mercury that were discharged into the Carson
River drainage, primarily in the form of mercury-contaminated tailings.
Many
elements that make the Iron King Mine Humboldt smelter Superfund interesting
was that it has been using a phytostabilization. Phytostabilization involves
the reduction of the mobility of heavy metals in soil. Immobilization of metals
can be accomplished by decreasing wind-blown dust, minimizing soil erosion, and
reducing contaminant solubility or bioavailability to the food chain. The
addition of soil amendments, such as organic matter, phosphates, alkalizing
agents, and biosolids can decrease solubility of metals in soil and minimize
leaching to groundwater. “The mobility of contaminants is reduced by the
accumulation of contaminants by plant roots, absorption onto roots, or
precipitation within the root zone” (Miller). In some instances, hydraulic
control to prevent leachate migration can be achieved because of the large
quantity of water transpired by plants.
Works Cited
Mendez, M.O., and R.M. Maier. 2008. Phytostabilization of
mine tailings in arid and semiarid
environments – an emerging remediation technology. Environ.
Health Perspec. 116:278-283.
Cunningham, W., &
Cunningham, M. (Date Accessed: 2012). Environmental science. (6th
ed.). New York, NY: McGraw-Hill.
Miller, R., 1996,
Phytoremediation, Technology Overview Report, Ground-Water Remediation
Technologies Analysis Center, Series O, Vol. 3, October.
Michael Schennum. Phoenix trying to redevelop 19th Avenue Landfill site. 2012. Photograph. The Arizona Republic
US EPA. EPA headquarters. 2012. Photograph. EPA.GOV
US EPA. four phases of EPA's. 2012. Chart. EPA.GOV
US EPA Region 6 Superfund. Nineteenth Avenue Landfill. 2012. Map. EPA.GOV, Arizona.
US EPA Region 6 Superfund. SOUTH CAVALCADE STREET in Harris County, Texas Site Status Summary 0602895. 2012. Map. EPA.GOV, Texas.
Michael Schennum. Phoenix trying to redevelop 19th Avenue Landfill site. 2012. Photograph. The Arizona Republic
US EPA. EPA headquarters. 2012. Photograph. EPA.GOV
US EPA. four phases of EPA's. 2012. Chart. EPA.GOV
US EPA Region 6 Superfund. Nineteenth Avenue Landfill. 2012. Map. EPA.GOV, Arizona.
US EPA Region 6 Superfund. SOUTH CAVALCADE STREET in Harris County, Texas Site Status Summary 0602895. 2012. Map. EPA.GOV, Texas.
No comments:
Post a Comment